Deliverables on Overhead
Summary of past deliverables related to overhead assets
Recent deliverables on distribution overhead assets are highlighted below.
2022
Number | Name | Date | Type |
3002024683 | Investigation of Frequent Tap Changes in Voltage Regulators: Switching Cycle Test | 12/31/2022 | Technical Results |
3002024059 | Drone Imagery for Utility Inspection | 12/31/2022 | Technical Results |
3002024684 | Pole Hardware Quality Testing and Material Analysis | 12/24/2022 | Technical Results |
3002024685 | Grounding and Lightning Performance | 12/31/2022 | Technical Results |
3002024686 | Design and Performance of Overhead Structures | 12/31/2022 | Technical Results |
3002024687 | Overhead Connector Performance | 12/31/2022 | Technical Results |
3002024689 | Online Monitoring of Overhead Distribution Systems: State of Technology and Case Studies | 12/31/2022 | Technical Results |
3002024691 | Evaluation of Pole Inspection Technologies | 12/31/2022 | Technical Results |
3002023592 | Wood Pole Management Guide: Inspection, Assessment, Mitigation and Remediation | 12/31/2022 | Technical Results |
3002024681 | Composite Structure Performance - Pole and Crossarm Hardware Testing | 12/31/2022 | Technical Results |
Past Deliverables: 2021 | 2020