Recent deliverables on distribution underground assets.

2023

Number Name Brief Description
Improve UG Asset Life and Performance
3002027534 Distribution Underground Switch Guide: 2023 Update This report is an update to a multi-year project investigating the life cycle performance of MV UG switches. The work from this historic research thread has produced a body of knowledge around underground switch life cycle performance. This report includes content for inclusion in the Medium Voltage Switch Design Review and Condition Assessment Reference Guide, under development, including chapter drafts for the Introduction and Overview, Switch Materials and Applications, Review of Industry Standards, Case Study Examples and References chapters.

Findings from this work can be used to inform your material specifications, inspection / maintenance and diagnostic approaches to achieve better performance of your switch fleet.

3002026866 Cable and Cable Accessory Performance: 2023 Update This report is an update to a multiyear project investigating the performance of medium voltage (MV) cable and cable accessories. The 2023 research sought to understand and illustrate the impact of various design and craft practice approaches on the anticipated health and performance of MV cable accessories. The report provides results from forensic examinations of early life failures of cold shrink cable joints installed on EPR insulated cables, installation damage truncating the life of a trifurcating cold shrink transition joint (PILC-to-EPR), and an early life failure of a pre molded straight joint (EPR – EAM).

Findings from this work can be used to inform your material specifications, inspection / maintenance and diagnostic approaches, and craft practices associated with accessory preparation to achieve better performance and improved reliability.

3002027553 Medium Voltage Cable Aging: 2023 Update This report describes two research streams into the performance of medium voltage (MV) EPR insulated cables. The first describes the development of a research project to understand the expected performance of new, non-traditional, EPR insulation technologies, including lead free EPR and EAM. The second is focused on documenting cable knowledge in the form of references to assist utilities in managing their cable fleets.

This report contains the first four chapters of a cable reference book intended to provide historical background and practical insight into the aging performance and management of medium voltage cables.

3002026934 Underground Distribution Automation Assets This report summarizes work performed in 2023 to examine the life cycle performance of MV automated UG switches. The report includes findings from the forensic examination of a failed G&W Trident-SR, an automated underground switch. The report also includes discussion of inspection tools and technologies for distribution automation assets based on learnings from multi-year research into these assets.

Findings from this work can be used to inform your material specifications, inspection / maintenance and diagnostic approaches to achieve better performance from your automated switch fleet.

Tools for UG Ascertaining Asset Health
3002026867 Infrared Thermography in Underground: 2023 Update This report provides an update of a multi year reach project to inform the use of IR as a diagnostic tool for underground cables and cable accessories. The report includes a description the test bed which will be used to examine heating of cable system components subjected to loading in the laboratory including the data to be acquired and analyzed, and a description of the test approach, including the analysis used to select representative load profiles to be used in the testing.

This research is aimed at producing information to better understand the implications of design and preparation practices on connector performance and life, and to inform infrared thermography.

3002026868 Network Transformer Monitoring: 2023 Update This report describes the test set and results from testing of a remote DGA monitor designed for use on network transformers when deployed on units using ester based insulating fluids. In addition, the report includes a Case Study of a utility approach for leveraging dissolved gas analysis results to manage their network transformer fleet.

Results from the research will inform remote gas monitor selection, and aid utilities in incorporating DGA into their network transformer fleet management approach.

Structures
3002026870 Manhole Event Research Summary 2019–2022 This report is a Powerpoint presentation which summarizes key learnings from a multiyear project investigating risk mitigation of manhole events, including testing to understand gas produced when LV cables overheat and arc. This presentation will underpin a 2024 taskforce webcast to identify next steps in this research.

Results from this research will inform sensing technologies for early identification of conditions which could lead to manhole events, as well as remote manhole monitor selection, deployment, and settings.

3002026869 Equipment and Structure Corrosion: 2023 Update This report is an update of a multiyear research project to better understand the corrosive environment of underground vaults and how it may impact metallic components to inform tank material selection and corrosion management approaches. The report includes a review of corrosion science techniques for determining the corrosivity of vault water solutions and describes field sample sets made up of metals that are being deployed and aged for one year in in-service vaults.

Results from this research will aid utility fleet managers in managing corrosion of UG assets.

Knowledge
3002026871 Bronze Book: 2023 Update The Bronze Book is a reference aimed at utility engineers and personnel involved in the planning, design, manufacture, installation, operation, and maintenance of underground distribution systems. For 2023, EPRI added a new chapter on Cable Quality.

The Cable Quality chapter includes content on cable manufacturing processes and modifications to design, manufacturing, materials and testing approaches to improve cable quality. It also describes where problems can occur and provides guidance for collaborating with cable manufacturers to improve specifications and reduce the likelihood of cable system failures.

UG Repository Underground Practices Repository_2023 Provides access to an online repository of underground practices to facilitate comparisons and aid decision-makers in identifying practices in place at other utilities that can be applied to their utility to improve performance.

See 2022 | Historic

1 - Deliverables on Underground Assets

Summary of past deliverables related to distribution underground assets

Recent deliverables on distribution underground assets.

2022

Distribution Underground Switches: 2022

This report is an update on to a multi-year project investigating the life cycle performance of MV UG switches. It includes content for inclusion in a Medium Voltage Switch Design Review and Condition Assessment Reference Guide, under development, from findings from multiple historic forensic examinations of UG switches of various types.

Findings from this work can be used to inform your material specifications, inspection and diagnostic approaches, and maintenance to achieve better performance in your switch fleet.

Cable Accessory Research: 2022

This report is an update to a multiyear project investigating the performance of medium voltage (MV) cable accessories. The 2022 research included the performance of forensic investigations of various accessories as well as continued longer-term research to understand and illustrate the impact of various workmanship approaches on the anticipated health of MV cable terminations as determined by the presence of partial discharge (PD).

Findings from this work can be used to inform your material specifications, inspection and diagnostic approaches, maintenance, and craft practices associated with accessory preparation to achieve better performance and improved reliability.

Infrared Thermography in Underground: 2022

This report is a provides an update to a multiyear project investigating the performance of low voltage (LV) cable accessories. In addition, the 2022 research included the design and partial construction of a MV cable accessory test bed which will enable analysis of MV connectors and cable materials subjected to heating in the laboratory, and inform the use of IR as a diagnostic tool.

This research is aimed at producing information to better understand the implications of design and preparation practices on connector performance and life, and to inform infrared thermography.

Network Transformer Monitoring: 2022 Update

This report describes the test set up and initial testing of a remote DGA monitor designed for use on network transformers when deployed on units using ester based insulating fluids.

Results from the research will inform remote gas monitor selection.

Risk Mitigation of Manhole Events: 2022 Update

This report is an update to a multiyear project investigating risk mitigation of manhole events, including testing to understand gas produced when LV cables overheat and arc. 2022 research included study of EAM and PILC cable materials exposed to arcing.

Results from this research will inform sensing technologies for early identification of conditions which could lead to manhole events, as well as remote manhole monitor selection, deployment, and settings.

UG Corrosion Identification and Assessment: 2022 Update

This report is an update to a multi-year project investigating inspection and assessment techniques for underground equipment. 2022 research included a focus on corrosion inspection and assessment of padmounted equipment. Research included a data discovery exercise to identify potential use cases for leveraging AI / image processing technology to aid inspectors.

Results from this research will aid utility fleet managers in managing corrosion of UG assets.

Bronze Book: 2022 Update

The Bronze Book is a reference aimed at utility engineers and personnel involved in the planning, design, manufacture, installation, operation, and maintenance of underground distribution systems. For 2022, EPRI added content on connectors to Chapter 15, Cable Accessories.

Low-Voltage Secondary Network Systems Reference – Hard Copy

This deliverable is a comprehensive, stand-alone reference on network systems. It includes content on network components and their operation, network designs, protection, modeling, arc flash reduction, and distributed generation on network systems.

Underground Practices Repository_2022

Provides access to an online repository of underground practices to facilitate comparisons and aid decision-makers in identifying practices in place at other utilities that can be applied to their utility to improve performance.

2 - Historic Deliverables on Underground

Summary of past deliverables related to underground distribution assets

Historic Deliverables

TitleCategoryProduct IDPublic
Cable Accessory Research: 2022Cable Accessories3002024695
Low Voltage Cable Accessory Research: 2021 UpdateCable Accessories3002021663
Medium Voltage (MV) Cable Accessory Research: 2021Cable Accessories3002021661
Low-Voltage Cable Accessory Research: 2020 UpdateCable Accessories3002018974
Low Voltage Cable Accessory Research: 2019 UpdateCable Accessories3002017510
MV Cable Accessory Research: 35-kV Termination InvestigationCable Accessories3002016384
Evaluation of Connectors for Medium-Voltage CablesCable Accessories1019598
Evaluation of Medium-Voltage Cable JointsCable Accessories1014439
Separable Connectors Construction Guide -- DVD: Procedures that Lead to Longer Connector LifeCable Accessories1007462
Proceedings: Separable Connector Workshop: November 7-8, 2001, PSE&G Training Center, Edison, New JerseyCable Accessories1006884
Estimation of the Future Performance of Solid Dielectric Cable AccessoriesCable Accessories1001725
Medium-Voltage Cable Joints - DVD: Installation, Design, Failure AnalysisCable Accessories1011507
NIPSCO Uses EPRI-Tested Technology to Identify Cable Problems and Save MoneyCable, Cable Materials and DiagnosticsIN-107941
Cable Reliability Management StrategiesCable, Cable Materials and Diagnostics1002257
Medium Voltage Cable Failure Trends: Research Status ReportCable, Cable Materials and Diagnostics1002256
Shield Losses in Medium-Voltage CablesCable, Cable Materials and DiagnosticsEL-5478
Maximum Safe Pulling Lengths for Solid Dielectric Insulated Cables, Volume 1: Research Data and Cable-Pulling ParametersCable, Cable Materials and DiagnosticsEL-3333-V1
Optimization of the Design of Metallic Shield-Concentric Conductors of Extruded Dielectric Cables under Fault ConditionsCable, Cable Materials and DiagnosticsEL-3014
Effects of Controlled Amounts of Moisture on the Performance of Paper-Insulated Lead-Covered CablesCable, Cable Materials and Diagnostics1023115
Distribution Class Nanodielectric Cable: Status Report and Future ProspectsCable, Cable Materials and Diagnostics1023039
Condition Assessment of Belted PILC Cables After 7 to 68 Years of ServiceCable, Cable Materials and Diagnostics1022749
Underground Distribution Cable Fleet ManagementCable, Cable Materials and Diagnostics1021997
Nanodielectrics for Underground Distribution Cables and Cable SystemsCable, Cable Materials and Diagnostics1019939
Nanodielectrics for Underground Distribution Cables and Cable SystemsCable, Cable Materials and Diagnostics1017688
Development of a Method to Introduce Controlled Amounts of Moisture in PILC CablesCable, Cable Materials and Diagnostics1014868
Nano-Composite Dielectrics on Medium-Voltage Model CablesCable, Cable Materials and Diagnostics1013885
State of the Art of Thin Wall CablesCable, Cable Materials and Diagnostics1001895
State of the Art of Thin Wall Cables Including Industry SurveyCable, Cable Materials and Diagnostics1001734
Demonstration of Nanocomposite Dielectric on Medium-Voltage Model CablesCable, Cable Materials and Diagnostics1015893
MV Cable Accessory Research: 2020Cable, Cable Materials and Diagnostics3002018965
Approaches for Cable Locating and Abandoning Underground CableCable, Cable Materials and Diagnostics3002021691
Ground Penetrating Imaging Radar Phase IICable, Cable Materials and Diagnostics1006152
Procedures for the Examination of the Metals Used in Electrical Power CablesCable, Cable Materials and Diagnostics1011273
Paper Insulated Lead Covered (PILC) CableCable, Cable Materials and Diagnostics1010213
AEP Removes a Record 4500 Feet of Cable Using EPRI TechniqueCable, Cable Materials and DiagnosticsIN-107734
Truck Redesign Lets Con Edison Realize Full Potential of New Cable Removal TechniqueCable, Cable Materials and DiagnosticsIN-106157
Effect of DC Testing on Extruded Crosslinked Polyethylene Insulated Cables--Phase IICable, Cable Materials and DiagnosticsTR-101245-V2
Detroit Edison Halts DC Proof Testing to Reduce XLPE Cable Failure RateCable, Cable Materials and DiagnosticsIN-105789
Advanced Cable Fault Locator: Volumes 1 and 2: Volumes 1 and 2Cable, Cable Materials and DiagnosticsEL-7451-V1
Advanced Cable Fault Locator: Volumes 1 and 2: Volumes 1 and 2Cable, Cable Materials and DiagnosticsEL-7451-LV2
Advanced Cable Fault LocatorCable, Cable Materials and DiagnosticsEL-6765
Distribution Systems – Underground Distribution: Evaluation of Advanced Cable Diagnostics-Gas Detection of Melted InsulationCable, Cable Materials and Diagnostics3002006121
Evaluation of Line Resonance Analysis (LIRA) for Diagnosing Defects in PILC CablesCable, Cable Materials and Diagnostics1019595
Advanced Diagnostics: Life Estimation of Extruded Dielectric CablesCable, Cable Materials and Diagnostics1011499
Feasibility of Guided Wave Inspection of Electrical CableCable, Cable Materials and Diagnostics1010209
In-Service Performance Evaluation of Underground Distribution CablesCable, Cable Materials and Diagnostics1009017
Guide for Non-Destructive Diagnosis of Distribution Cable SystemsCable, Cable Materials and Diagnostics1001731
Advanced Diagnostics: Estimation of Life of Extruded Dielectric CablesCable, Cable Materials and Diagnostics1001727
Advanced Diagnostics: Estimation of Life of Extruded Dielectric Cables: Interim ReportCable, Cable Materials and Diagnostics1001726
Assessment of Paper-Insulated Lead-Covered Cable Condition: Electrical, Chemical, and Metallurgical ConditionCable, Cable Materials and Diagnostics1001724
Estimation of Remaining Life of XLPE-Insulated Cables: Distribution Cable Aging and Reliability IssuesCable, Cable Materials and Diagnostics1000273
Research to Develop Guidelines for Cathodic Protection of Concentric Neutral Cables, Volume 3Cable, Cable Materials and DiagnosticsEL-1970-V3
Research to Develop Guidelines for Cathodic Protection of Concentric Neutral Cables, Volume 2Cable, Cable Materials and DiagnosticsEL-1970-V2
Research to Develop Guidelines for Cathodic Protection of Concentric Neutral Cables, Volume 1Cable, Cable Materials and DiagnosticsEL-1970-V1
PSE&G Failure Analysis Investigation ECTN 2004Cable, Cable Materials and Diagnostics1012050
Infrared Thermography in Underground: 2022 UpdateCable, Cable Materials and Diagnostics3002024696
Infrared Thermography in Underground: 2021 UpdateCable, Cable Materials and Diagnostics3002021666
Sensors for Underground Distribution SystemsCable, Cable Materials and Diagnostics1017686
Underground Distribution SensorsCable, Cable Materials and Diagnostics1015888
Low-Cost Sensors to Monitor Underground Distribution SystemsCable, Cable Materials and Diagnostics1013884
Low-Cost Sensors to Monitor Cable Temperature: Interim ReportCable, Cable Materials and Diagnostics1012304
Protecting Electrical Equipment from Red Imported Fire AntsOther Undergrounding TopicsTR-109987
Distribution Grid Resiliency: UndergroundingOther Undergrounding Topics3002006782
Distribution Grounding of Underground FacilitiesOther Undergrounding Topics3002001289
Overvoltages in Underground Systems, Phase 2 ResultsOther Undergrounding TopicsTR-109669-R1
Overvoltages in Underground Systems, Phase 1 ResultsOther Undergrounding TopicsTR-109669
Low Voltage Secondary Network Cable Reliability StudyOther Undergrounding TopicsTR-104863
EPRI Underground Distribution Systems Reference Book: 2022 UpdatePractices and References3002024700
Managing Urban Underground Systems: 2018 Survey ResultsPractices and References3002012906
Underground DistributionPractices and References1019596
Urban Networks Simulation ToolsPractices and References1017690
Transmission and Distribution Apps (TDApps) Urban Underground Practices RepositoryPractices and References3002022525
Underground Distribution System Practices: 2020 UpdatesPractices and References3002018971
Underground Distribution System Practices RepositoryPractices and References3002016387
EPRI Urban Underground Practices RepositoryPractices and References3002012907
Urban Network Practices: Portland General ElectricPractices and References3002010169
Urban Network Practices: Duke Energy FloridaPractices and References3002007997
Underground Distribution: Urban Network Practices Survey - 2015Practices and References3002006136
Urban Network Practices: AEP OhioPractices and References3002006135
Urban Network Practices: ESB NetworksPractices and References3002004882
Urban Network Practices: EnergexPractices and References3002003253
Urban Network Practices: Georgia Power CompanyPractices and References3002003252
Urban Network PracticesPractices and References1024836
Underground Distribution: Urban Network Practices Survey - 2012Practices and References1024393
Urban Network Practices: Ameren MissouriPractices and References1024391
Urban Network Practices: Pacific Gas and Electric CompanyPractices and References1023268
Urban Network PracticesPractices and References1022689
Urban Network Systems PracticesPractices and References1019935
Distribution Cable Fleet Management: Catalog and Assessment of Industry PracticesPractices and References1019934
Hawaiian Electric Company (HECO) Underground Distribution Systems PracticesPractices and References1019597
Urban Underground Distribution PracticesPractices and References1017689
Urban Network Systems - Technologies and Best PracticesPractices and References1015894
Urban Network System PracticesPractices and References1013888
EPRI Low-Voltage Secondary Network Systems Reference BookPractices and References3002023996
EPRI Underground Distribution Systems Reference Book: 2020 RevisionPractices and References3002018091
EPRI Underground Distribution Systems Reference Book: 2019 EditionPractices and References3002016390
EPRI Underground Distribution Systems Reference Book - Supplemental Content, Chapter 6 Content: Overcurrent ProtectionPractices and References3002006895
EPRI Underground Distribution Systems Reference BookPractices and References1012306
Low-Voltage Secondary Network SystemsPractices and References3002022947
Low Voltage Secondary Network Training, Overview and Review of Network ComponentsPractices and References3002016389
UG Corrosion Identification and Assessment: 2022 UpdateUG Equipment3002024701
Underground Structure/Equipment Corrosion: 2019 Workshop SummaryUG Equipment3002016386
Network Transformer Monitoring: 2022 Update Evaluation of Online Monitor with Alternative Insulating FluidsUG Equipment3002024698
Distribution Underground Switches: 2022 UpdateUG Equipment3002024694
Distribution Underground Switches: 2021 UpdateUG Equipment3002021660
Distribution Underground Switches: 2020 UpdateUG Equipment3002018960
Distribution Underground Switches: 2019UG Equipment3002016383
Distribution Underground Switch Testing and Analysis: 2018 UpdateUG Equipment3002012872
Distribution Underground Switch Testing and AnalysisUG Equipment3002010153
Dissolved Gas Analysis for Network Transformers: 2021 Remote Sensor EvaluationUG Equipment3002021662
Dissolved Gas Analysis for Network Transformers: 2020 Remote Sensor EvaluationUG Equipment3002018966
Assessment of Dissolved Gas Analysis for Network Transformers: Case Studies and Test DevelopmentUG Equipment3002016385
Manhole Arc Recognition System (MARS)Underground Event Research3002005002
Manhole Event Risk Management StrategiesUnderground Event Research1015889
Manhole Event Risk ManagementUnderground Event Research1013886
Underground Structure Monitoring Guiding Alarm Settings and Monitor DeploymentUnderground Event Research3002022789
Underground Assets: Risk Mitigation of Manhole EventUnderground Event Research3002018957
Evaluation of Gases Generated by Heating and Burning of CablesUnderground Event ResearchTR-106394
Risk Mitigation of Manhole Events: 2022 UpdateUnderground Event Research3002024693
Risk Mitigation of Manhole Events: 2021Underground Event Research3002021659
Testing the Effectiveness of a Short-Arm Restrained Manhole Cover and Frame Combination: Southern California Edison Manhole Supplemental ProjectUnderground Event Research3002017160
Underground Assets: Risk Mitigation of Manhole EventsUnderground Event Research3002016391
Underground Structure Risk Mitigation — 2017-2019 Project Highlights: Manhole SupplementalUnderground Event Research3002015181
Testing the Effectiveness of Manhole Cover and Frame Combinations Used to Mitigate Event Damage at Underground Structures: Eversource Manhole Supplemental ProjectUnderground Event Research3002014761
Testing the Effectiveness of Covers and Baffles Used to Mitigate Event Damage at Round Enclosures: PG&E Round Enclosure SupplementalUnderground Event Research3002012503
Underground Structure Risk Mitigation: 2017–2018 Manhole SupplementalUnderground Event Research3002011871
Risk Mitigation of Underground Structures: Test Approach and ResultsUnderground Event Research3002011647
Gas Explosion Tests on Pacific Gas and Electric Company Round Manhole Covers with the Swiveloc CPR-II - Controlled Pressure Release Manhole Cover Restraint SystemUnderground Event Research1020559
Gas Explosion Tests on East Jordan Iron Works Rectangular Composite Secondary Box Covers for Con EdisonUnderground Event Research1019482
Gas Explosion Tests on Con Edison's Prototype CoversUnderground Event Research1019477
Manhole Event Gas Explosion ModelingUnderground Event Research1018404
Reducing Manhole Risk: DTE Energy and EPRI Collaborate on Landmark Project to Enhance SafetyUnderground Event Research1018073
Manhole Event Gas Explosion ModelingUnderground Event Research1016476
Final Report on Explosion Tests of Clogged Vented Covers for Con Edison at LenoxUnderground Event Research1015223
Rain Shedding and Rainwater Runoff Tests on Cast Iron Vented Manhole Covers for Con EdisonUnderground Event Research1015222
Measurement of Air Exchange in Interconnected Underground Structures for Con EdisonUnderground Event Research1015221
Manhole Cover Tests for Con Edison at the EPRI Manhole Testing FacilityUnderground Event Research1015220
Manhole Event Mitigation StrategiesUnderground Event Research1012305